Filter by changing the following parameters:
Supplier - Select the supplier from the drop-down list.
Mat'l AC Date From - Click
to select the start
date of the material At Consolidator Date period.
Mat'l AC Date To - Click
to select the end date
of the material At Consolidator Date period.
The filtered delivery details will be listed under the toolbar with
the following details:
Material AC Date - Different meanings in 3 levels.
- Group Head Level - Indicates the material AC Date, FG supplier, FG factory
and COO.
- Delivery Detail Line level - Indicates material color and committed
quantity for fabric, Size/finish/material color and committed quantity for trim.
Note:
For the demand line. It will just show material AC Date for surplus
lines.
Note:
If the demand line belongs to a greige group, it will be shown
as greige and committed quantity. If the demand line belongs to no size
group, it will be shown as no size/material color and committed quantity.
Delivery Information Level - Indicates the delivery information.
- Material Ship Mode - Indicates how the material will be shipped. It
is defaulted as unassigned.
- Actual Material AC Date - Indicates the actual material At Consolidator
Date. It is defaulted to Blank.
Delivery Qty - Indicates the delivery quantity of the current line.
It is defaulted as 0.
+/- - Indicates the overage or shortage quantity of the current line.
Note:
Overage/ Shortage = Total Delivery Qty - Total Committed Qty by
AC Date.
Flight#/Vessel# - Indicates the Fight number or Vessel number of the
delivery line.
ETD - Indicates the estimated time of delivery.
ETA - Indicates the estimated time of arrival.
Delivery Status - Indicates the delivery status. It is defaulted as
In-Progress.
Comments - Indicates the comments regarding the delivery.