Right-click the selected designs and click Revise.
A new column, Target Revision is added in the
ENOVIA Save dialog box. The target revision specified
in the ENOVIA Save Options dialog box is set as the revision.
You can edit the values of the revision specified under the Target Revision
column.
Click Refresh. The rows for which revisions are selected are refreshed.
Note:
- You can enter any existing (stored in ENOVIA) or new revision in Target
Revision column.
- It is not mandatory that the subsequent revisions specified are in
sequence. For example, the specified revisions can be of the order, A,
B, and F.
|