Editing Time Line Details

This section describes how to edit time line details.

  1. From the global toolbar, click > Early Time and Action. The Early Time and Action page opens.

  2. Click Name of the Early Time and Action or click at the end of the row, the Time and Action page opens and consist of two tabs, namely Properties and Materials.

    Note: The Materials tab can be only shown when the selected template type equals to Product (with Material Activities).

  3. From the page toolbar, click Categories > Time Line, the Early Time and Action: Time Line page opens and displays the time lines of the finished good and its materials.

  4. From the Plan Date level, click hyperlink of the Event, the Select Closing Date page opens.

    Note: Only the events with "Match with Closing Date" will be provided the hyperlink for user to select the closing date. See Listing Time and Action Events.

    Select a date and click Done.

  5. From the page toolbar, click Mode.

  6. The Plan Date of different events can be edited, such as FG Order Confirmation, Greige Commit Due, Color/Finish Commit Due, Material AC Date, Material Arrival Date, FGPA Due, FG AC Date and Delivery Date 1.

  7. Click Apply.