Description
|
Description of the cost scenario. |
| Comments
|
Comments about the cost scenario. |
| Currency
|
Currency of the cost scenario. |
| Retail Price |
Retail price of the product. |
| Originated |
Date the product originated. |
| Total Fabric Cost |
Calculated cost of the fabric based on the library
cost multiplied by quantity as specified in the BOM. |
| Total Trim Cost |
Calculated cost of the trim based on the library
cost multiplied by quantity as specified in the BOM. |
| Total Label Cost |
Calculated cost of the label based on library cost
multiplied by quantity as specified in the BOM. |
| Total Packaging Cost |
Estimated Packaging Cost. |
| Cut and Make Costs |
Estimated Cut and Make Costs. |
| Dye/Wash Cost |
The dye/wash cost. |
| Quota Charge |
Estimated quota charge. |
| Miscellaneous Costs |
Miscellaneous Costs. |
| First Cost |
Calculated total cost generated using the formula: total
fabric cost + trim cost + cut/make cost + wash cost + label cost + packaging. |
| Factory Overhead |
Additional overhead costs associated with product
development. |
| Freight Cost Int'l |
Cost of freight for international shipping. |
| Freight Cost Local |
Cost of freight for local shipping. |
| Estimated Landed Cost |
Estimated landed cost by the formula: first
cost * landed factor + overhead |
| IMU (Retail) |
Initial markup, which is the calculated percentage generated
using the formula: (retail price - estimated landed cost)/estimated landed
cost. |